Real projects in industrial automation.

All case studies.

3 case studies

  • Deck of the Ulisse cable-laying vessel: the carousel holding the cable, the green guide crane and the winches.

    Cable & fiber opticsPrysmian Group

    The Ulisse cable‑laying vessel

    Carousel, caterpillar, crane and winches in step on the same cable as it goes into the sea.

  • Base of two optical fiber drawing towers: green structure, operator panels and signal towers.

    Cable & fiber opticsConfidential client

    Optical fiber drawing towers

    Vertical towers with HMI, alarms and diagnostics that operators and maintenance read instantly.

  • Tube line in the workshop: stations with yellow pulleys and the control panel built into the line.

    Cable & fiber opticsConfidential client

    The fiber tube line

    Payoffs, drives and a line-side control panel, wired and ready for testing.

The first step

The next case study could be your plant.

Read by an engineer, not an automatic quote tool: reply within 1–2 business days.