Codes, supplies, protections and devices must stay consistent across schematic, BOM and layout.
Electrical engineering
Industrial electrical engineering, with no room for interpretation.
D&D turns specifications, machine layouts and customer standards into working documents for those who have to build, wire, test and maintain the plant.
Where the cost comes from
An unclear drawing turns into wasted time in the workshop and in the field.
Electrical engineering has to reduce questions, rework and ambiguity. Every tag, terminal, cable, component and revision must read the same way to different people.
Panel, machine side and field signals need connections that are orderly, testable and maintainable.
Spaces, trunking, ventilation and access affect build time and future work.
Changes must be visible, approved and reflected in the documents used in the workshop.
From data to document
Every drawing comes from a real constraint.
We start from specifications, components, machine layout, customer standards and target market. From these inputs we build documentation that stays useful during build, testing and maintenance.
FROM SCHEMATIC TO BENCH
Documentation made for those who have to build, wire and test.
Schematics, layouts, terminal blocks, BOMs and revisions are designed as one technical pack: readable in the office, useful in the workshop, reliable in maintenance.
Every drawing must be readable by the people who actually use it.
Documentation is not decorative: it links design choices, materials and checks in a flow that reduces doubts during wiring, testing and future revisions.
-
01
Electrical schematic
Functions, protections, cross-references and connection logic.
-
02
Panel layout
Real spaces, trunking, terminal blocks, access and component arrangement.
-
03
BOMs and lists
Codes, quantities, tags, terminals, cables and materials always aligned.
-
04
Testing and revisions
Documents ready for checks, future changes and maintenance.
Checks before delivery
Quality shows when someone has to wire it.
Before closing the project we check consistency between schematic, layout, BOM and lists. The point is not to produce many files: it is to deliver a usable technical set.
Concrete outputs
What we deliver to the customer.
The content depends on the scope, but the logic stays the same: working documents linked to each other, not isolated drawings.
Complete electrical schematics
Orderly drawings with references, protections, terminal blocks, connections, notes and build logic.
Panel layout
Component arrangement, trunking, ventilation, access and consistency with the schematic.
Terminal blocks
Clear connection points for panel, machine side, field signals and testing.
Cable lists
Origin, destination, cross-section, tagging and references useful for wiring and maintenance.
Bills of materials
Codes, quantities and components consistent with purchasing, production and spare parts.
When it makes sense to contact us
Before ordering components, building the panel or sending the pack to the workshop.
- You have customer specifications but the working design is missing.
- You need to standardise schematics, panel layout, cable lists and BOMs.
- You need updated documentation after changes or revamping.
- The panel must meet standards or formats required by the end customer.
Technical contact
Have an electrical spec to turn into a design?
The first step is to share specifications, layouts, customer standards, components already chosen and the target market. From there we define the scope, the drawings needed and the priorities.