FAT / SAT / Start-up / Teleservice

Industrial testing and start-up without losing control.

D&D supports testing, commissioning, first production runs and post-start-up support with tracked tests, technical priorities and clear responsibilities for maintenance, production and the machine builder.

I/O checks FAT / SAT Open-points list Remote support

Where start-up gets stuck

In the field, the biggest cost comes from unfinished details.

Start-up becomes fragile when a signal, sequence, safety function or responsibility is only clarified in front of a stopped machine. The method is there to reduce that risk before the critical date.

01 Inconsistent signals

Inverted sensors, unstable analog references, misaligned drives and unreachable devices.

02 Interlocks found too late

Manual, automatic, reset, restarts and safety must be tested by scenario before production pressure.

03 Scattered open points

If every issue stays in chat or spoken word, it gets hard to decide priority, owner and closure moment.

04 Operators not aligned

Production and maintenance must understand states, alarms, resets and limits before the plant runs at full rate.

Before the critical date

Field work runs smoothly when the scope is already in order.

Before the SAT we gather the state of the panel, software, I/O, networks, documentation and production constraints. The goal is not to start from scratch in front of the line, but to arrive with tests, roles and priorities.

FAT Repeatable tests

Signals, sequences and critical functions are anticipated where possible.

SAT Real constraints

Field, safety, line timing and operator availability all enter the plan.

Post start-up Stabilisation

Technical support, backups and operating notes stay available after the first switch-on.

Industrial plant on a vessel during checks and start-up activities.
Field Start-up connects design, panel, software and the real conditions of the line.

Operational start-up plan

Three moments, one technical log.

The method separates what has to be checked first, what has to be decided in the field and what remains to be monitored in the first production days.

01

Before the FAT / SAT

Document collection, software version checks, panel status, I/O list, networks and safety constraints.

02

During start-up

I/O checks, functional tests, stop/restart scenarios, alarms, recipes and notes in the open-points list.

03

After first production

Training, backups, remote support, remaining priorities and assistance on anomalies that appear under full load.

Open-points list

Every anomaly must have an impact, an action and an owner.

An open point isn't just a problem: it's a decision to make. That is why we distinguish blocking issues, optimisations, customer tasks and checks to repeat.

Point Axis 2 drive not ready in automatic
Impact Cycle blocked on restart
Action Check the enable sequence and feedback
Status To retest with material

Field rhythm

Start-up isn't just being on site. It's controlled progress.

From FAT/SAT to first production, D&D organises tests, anomalies and technical steps with a clear method: less improvisation, more operational control.

  1. 01 In preparation

    Preparation

    Software versions, schematics, I/O, networks, safety and machine constraints are verified before arriving on site.

    documents versions networks I/O
  2. 02 Under test

    Field tests

    Signals, scenarios, enables, stops, restarts and interlocks are tested methodically, not by trial and error.

    FAT/SAT signals safety interlocks
  3. 03 Closing out

    Stabilisation

    Anomalies are tracked, ranked by priority and closed until the line reaches controlled production.

    punch list debug priorities training
  4. 04 Operational

    Support

    Backups, technical notes, remote assistance and handover mean the customer isn't left alone after go-live.

    backup notes remote handover

Concrete outputs

What the customer receives at the end of the intervention.

The goal is to leave the plant governable even after the on-site presence: the tests carried out, changes, backups, open points and next actions must all be clear.

01

Test plan

The sequence of checks carried out or to complete, with shared priorities.

02

I/O report

Critical signals tested, anomalies found and corrections made.

03

Open-points list

Issues, impact, owner, status and next check.

04

Backups and versions

The software state delivered, change notes and technical references.

05

Operator training

Support for operators and maintenance on states, alarms, resets and restarts.

06

Post-start-up support

On-site or remote assistance to stabilise the plant through the first production runs.

When to call us

It makes sense to involve us before the production date is already critical.

  • You have a limited downtime window and want to arrive with a ready checklist.
  • The machine builder, end customer and maintenance need to close technical decisions.
  • You want support for start-up, diagnostics, training or teleservice after delivery.
  • There are software or panel changes to validate before increasing the production rate.

Technical contact

Have a start-up date or a downtime window?

The first step is to share the state of the project, panel, software, available time and line constraints. From there we define what to test first, what is needed in the field and which support to keep after go-live.

If the line has to start

Send us the expected date, software status, panel status and production constraints.

If the plant is already down

We start from the symptom, alarm, stop conditions and the possibility of remote access.